SBI Term Loan: RLLR: 8.15 | 7.25% - 8.55%
Canara Bank: RLLR: 8 | 7.15% - 9.85%
ICICI Bank: RLLR: -- | 8.5% - 9.65%
Punjab & Sind Bank: RLLR: 7.3 | 7.35% - 10.75%
Bank of Baroda: RLLR: 7.9 | 7.2% - 8.95%
Federal Bank: RLLR: -- | 7.35% - 9.6%
IndusInd Bank: RLLR: -- | 7.6% - 10%
Bank of Maharashtra: RLLR: 8.05 | 7% - 9.15%
Yes Bank: RLLR: -- | 7.4% - 10.54%
Karur Vysya Bank: RLLR: 8.8 | 8.5% - 10.65%
HDFC Bank: RLLR: -- | 7.75% - 13.2%
Axis Bank: RLLR: -- | 8% - 9.1%
IDBI Bank: RLLR: -- | 7.4% - 10%

Location : Mumbai

NMMC speeds up road repairs ahead of Ganeshotsav

12 Sep 2026

The Navi Mumbai Municipal Corporation (NMMC) has accelerated road improvement works across its jurisdiction ahead of Ganeshotsav 2026, following directions issued by municipal commissioner Dr Kailas Shinde in the past week. The engineering department has prioritised roads used for the arrival and immersion of Ganesh idols, along with major roads across the city. Departmental teams are inspecting road conditions and undertaking repairs based on their findings, including potholes, damaged surfaces, uneven levels and the condition of drainage and other covers. During the monsoon, potholes are being repaired using Mastic Geopolymer or cold mix, with conventional asphalting planned after a break in rainfall. The civic body is also focusing on cleanliness, street lighting and facilities at immersion locations to ensure the festival routes remain accessible and safe.Read more

cover photo

NMMC reviews arrangements for Rajbhasha Sammelan in Vashi

12 Sep 2026

The Navi Mumbai Municipal Corporation (NMMC) commissioner Dr Kailas Shinde has reviewed preparations for the sixth All India Rajbhasha Sammelan, scheduled to be held at the CIDCO Exhibition Centre in Vashi, Navi Mumbai, on September 14 and 15, 2026. The two-day national-level event, organised by the Department of Official Language under the Government of India, is expected to draw a large number of officials and employees from government departments, public sector undertakings and banks from across the country. Union home minister Amit Shah is also scheduled to attend the event. Given NMMC’s role as the local civic authority, Shinde convened a coordination meeting involving officials from the civic body, police, traffic police, Public Works Department and CIDCO to review preparations and assign responsibilities.Read more

cover photo

BMC clears contentious land proposals worth over INR 20,000 crore amid Opposition walkout

Mumbai News Desk

11 Sep 2026

The Brihanmumbai Municipal Corporation (BMC) has approved a series of high-value land and redevelopment proposals collectively estimated to involve assets worth over INR 20,000 crore, despite a walkout by Opposition corporators who alleged that the resolutions were passed without adequate discussion. The cleared proposals include the redevelopment of SevenHills Hospital, the lease of the Century Mills land parcel and changes involving civic land reservations. The ruling alliance defended the approvals, saying the proposals had already undergone scrutiny in the relevant civic committees.Read more

cover photo

Godrej Avenue Eleven - Tower B

11 Sep 2026

Mumbai City, India

Godrej One Mahalaxmi is an under-construction luxury residential development by Godrej Properties in Mahalaxmi, Mumbai, offering spacious 3 and 4 BHK configurations across two towers. The 4-acre project features extensive amenities including an elevated podium garden, swimming pool, and sports facilities, with prices ranging from INR 16.80 Cr to INR 19.20 Cr.

View Website | Visit RERA website

cover photo

GVP Realty unveils INR 600 crore luxury tower at Bandra

10 Sep 2026

Mumbai-based developer GVP Realty has launched MANSION XXI, an ultra-luxury sea-facing residential tower worth over INR 600 crore at Bandra Bandstand. The 26-storey development offers a limited collection of residences and penthouses, with floor plates of 4,237 square feet and penthouses extending to 8,000 square feet. The launch comes as premium land parcels at the coastal address grow increasingly scarce, with research citing sea-facing residences in the locality commanding a premium of 15-20 per cent over comparable inland properties in Mumbai's luxury housing market.Read more

cover photo

Century Mill workers' families set for new homes after two-decade wait

Mumbai News Desk

10 Sep 2026

Nearly two decades after Century Mills shut in December 2006, 476 eligible mill-worker families are set for permanent rehabilitation on the mill's 6.17-acre plot in Lower Parel, Mumbai, after the Brihanmumbai Municipal Corporation (BMC) selected Peddar Realty Ltd's INR 1,351-crore bid to redevelop the land. The redevelopment will feature a high-rise residential complex modelled on MHADA projects, with eligible tenants receiving rehabilitation flats of around 405 sq ft, while additional apartments built on the land are sold in the open market to generate revenue for the BMC.Read more

cover photo

NGT halts further MMRDA land allotments in Wadala without prior environmental clearance

10 Sep 2026

The National Green Tribunal has directed the Mumbai Metropolitan Region Development Authority (MMRDA) to obtain prior Environmental Clearance (EC) for the entire 122.10-hectare Wadala Notified Area and barred further land allotments until the clearance is secured. The Western Zone Bench held that the project, which was originally planned as a truck terminal and later expanded into a commercial and residential development, falls within the scope of the Environment Impact Assessment Notification, 2006. The ruling could affect MMRDA’s plans to dispose of additional plots in the strategically located Wadala area through tender.Read more

cover photo

MSRDC races to secure vulnerable stretch of Mumbai-Pune Expressway Missing Link

Mumbai News Desk

10 Sep 2026

The July rockfall on the Mumbai-Pune Expressway’s Missing Link has prompted the Maharashtra State Road Development Corporation (MSRDC) to strengthen protection on the hillside above the tunnel mouths. Boulders weighing an estimated 17–20 tonnes fell during the July 6 landslide, damaging the tunnel entrance’s false frame. Following a slope assessment by IIT Bombay, additional measures are now being implemented across about 1.38 hectares. Around 50–60% of the work is complete, with MSRDC targeting October-end for completion of the protection measures.Read more

cover photo

Dosti Mezzo 22

10 Sep 2026

Mumbai City, India

Dosti Mezzo 22 is an under-construction high-end residential complex by Dosti Realty located in Sion East, Mumbai, offering 2 and 3 BHK apartments across 1.5 acres. The project features modern amenities like a 20m lap pool, gymnasium, and strong connectivity to the Eastern Express Highway and BKC.

View Website | Visit RERA website

cover photo

New CSMT-Sawantwadi train strengthens Mumbai-Konkan connectivity

09 Sep 2026

Indian Railways has introduced a daily express service connecting Chhatrapati Shivaji Maharaj Terminus (CSMT) in Mumbai with Sawantwadi Road, providing a direct rail link across key locations in the Konkan region. The service, covering around 510 km, was flagged off by Union railway minister Ashwini Vaishnaw, Union commerce and industry minister Piyush Goyal and Maharashtra deputy chief minister Eknath Shinde. The train will serve stations across Raigad, Ratnagiri and Sindhudurg, including Thane, Panvel, Ratnagiri, Kankavli, Kudal and Sawantwadi. The service is expected to support travel during festivals and holidays, while improving access for residents, students, workers, traders and tourists. The launch comes alongside wider railway capacity projects in Mumbai, including platform extensions, signalling upgrades and 238 sanctioned AC local train rakes.Read more

cover photo

Mumbai’s Gaiety-Galaxy temporarily shut amid licence issue and technical problems

Mumbai News Desk

09 Sep 2026

Mumbai’s iconic Gaiety-Galaxy cinema complex in Bandra West has temporarily stopped screenings following police action linked to the theatre’s operating licence. The closure reportedly came after a disturbance at the venue over the non-premiere of Hanuman Ansh, following which police examined the theatre’s documents and found an issue with its licence renewal. Theatre executive director Manoj Desai, however, has attributed the temporary shutdown to burnt electrical cables that need to be replaced. The conflicting explanations have put the spotlight on both the cinema’s regulatory compliance and the technical work required before screenings can resume.Read more

cover photo

Bombay HC clears long-delayed revival of Swadeshi Mills and development of Chunabhatti land

Mumbai News Desk

09 Sep 2026

The Bombay High Court has cleared the way for the revival of Swadeshi Mills Company and development of its 48-acre land parcel in Chunabhatti, bringing an end to a prolonged legal dispute surrounding the property. The court allowed appeals filed by Grand View Estates and Forbes & Co, which together hold more than 53% of the company’s share capital. The revival proposal is expected to benefit 2,834 former mill workers, many of whom have awaited settlement of their dues for more than two decades. The ruling could now enable the long-delayed development of one of Mumbai’s large contiguous land parcels.Read more

cover photo

Mumbai builders face tougher approvals as BMC links project permissions to pollution compliance

Mumbai News Desk

09 Sep 2026

The Brihanmumbai Municipal Corporation has tightened conditions for construction approvals by making compliance with prescribed air-pollution mitigation measures a factor in retaining development permissions. Under a September 2 circular, failure to implement required safeguards can lead to suspension of architects’ or licensed surveyors’ licences and revocation of development permission. Construction activity carried out after a stop-work notice may also attract a penalty equivalent to 100% of applicable premium rates. The move comes amid heightened scrutiny of construction-related emissions and follows directions from the Bombay High Court on Mumbai’s air quality.Read more

cover photo

Breach Candy residents seek traffic safeguards as Mumbai Coastal Road gardens take shape

Mumbai News Desk

09 Sep 2026

Residents of Breach Candy and adjoining South Mumbai neighbourhoods have raised concerns over the proposed recreational development along the Mumbai Coastal Road, warning that new garden attractions and multiple access points could increase traffic, parking pressure, pedestrian movement and noise in an already congested area. The planned open-space development will cover around 53 hectares of reclaimed land between Priyadarshini Park and Worli and is expected to include sports facilities, forest trails, gardens and food and beverage areas. Residents have opposed three proposed access points in Breach Candy and are seeking a dedicated Coastal Road exit towards Nepean Sea Road.Read more

cover photo

Shapoorji Pallonji BKC 9

09 Sep 2026

Mumbai City, India

Shapoorji Pallonji BKC 9 is an under-construction luxury residential development in Bandra East, Mumbai, offering 2 and 3 BHK apartments across a single 22-storey tower. Developed by Vakratunda Buildcon Private Limited, the project features premium club-like amenities, modern configurations, and expected possession by July 2028.

View Website | Visit RERA website

cover photo

Mazagon Dock emerges as sole EoI applicant for Dighi shipbuilding cluster

Mumbai News Desk

08 Sep 2026

Mazagon Dock Shipbuilders Ltd (MDL) has emerged as the sole applicant for the anchor shipyard role in Maharashtra’s proposed greenfield shipbuilding cluster at Dighi in Raigad, with the project now estimated to cost around INR 27,500 crore. The anchor shipyard will be required to invest at least INR 7,500 crore and develop a facility with a design capacity of at least 0.5 million gross tonnes (GT) annually within 10 years. The cluster is planned across 2,000 acres with 2.6 km of waterfront and is being developed by National Shipbuilding & Heavy Industries Park Maharashtra Ltd, an equal SPV of the Maharashtra Maritime Board and Mumbai Port Authority. The project will include shipbuilding, repair and ancillary manufacturing facilities, supported by common maritime and landside infrastructure.Read more

cover photo

MMRDA initiates development mapping across 166 sq km of Raigad

Mumbai News Desk

08 Sep 2026

The Mumbai Metropolitan Region Development Authority (MMRDA) has appointed a consultant to conduct an aerial survey, ground verification and GIS-based mapping across roughly 166 sq km of notified growth clusters in Raigad district, spanning the Neral, Karjat, Poynad and Alibag Surrounding Areas. MMRDA was appointed Special Planning Authority for these clusters in May 2026, and the consultant's mandate covers collection of land ownership data, cadastral correlation with existing land use, and preparation of a base map ahead of Development Plan preparation.Read more

cover photo

Bombay High Court quashes ED’s INR 100 crore freeze on Coda Payments India

08 Sep 2026

The Bombay High Court has set aside the Enforcement Directorate’s freezing of funds worth around INR 100 crore belonging to a gaming company, finding the action excessive and disproportionate. The court examined whether the agency had complied with the statutory requirements governing freezing of bank accounts under the Prevention of Money Laundering Act. The ruling underscores the need for enforcement authorities to follow prescribed safeguards while restricting access to financial assets and comes as the gaming sector faces increased scrutiny from investigative and regulatory agencies.Read more

cover photo

No tax on value of new property under redevelopment agreement, rules ITAT Mumbai

08 Sep 2026

The Income Tax Appellate Tribunal (ITAT), Mumbai, has ruled that a tenant surrendering existing tenancy rights under a redevelopment agreement cannot be taxed on the stamp duty value of the new premises promised to him, merely because the agreement was registered, when construction remains incomplete and possession has not been handed over. Setting aside additions of INR 1.38 crore made under Section 56(2)(x) of the Income-tax Act in the case of assessee Manoj Devshi Chhadva, the Tribunal held that mere execution and registration of a redevelopment agreement creates only a future contractual right, not an actual "receipt" of immovable property, and that the transaction, being in exchange for surrendered tenancy rights, was in any case supported by valid consideration.Read more

cover photo

Maharashtra clears INR 1,722 crore connector linking VBSL to Bandra Fort

Mumbai News Desk

08 Sep 2026

The Maharashtra government has approved a INR 1,722.40-crore connector linking the Bandra end of the under-construction Versova-Bandra Sea Link (VBSL) with Bandra West, Pali Hill and Bandra Fort. The 3.55-km, four-lane road will provide an additional access point near Bandra Fort, opposite Taj Lands End, and is intended to ease congestion on narrow internal roads. The Maharashtra State Road Development Corporation (MSRDC) will implement the project. Tendering is expected to begin within two to three months, while geotechnical surveys are already underway.Read more

cover photo