SBI Term Loan: RLLR: 8.15 | 7.25% - 8.55%
Canara Bank: RLLR: 8 | 7.15% - 9.85%
ICICI Bank: RLLR: -- | 8.5% - 9.65%
Punjab & Sind Bank: RLLR: 7.3 | 7.35% - 10.75%
Bank of Baroda: RLLR: 7.9 | 7.2% - 8.95%
Federal Bank: RLLR: -- | 7.35% - 9.6%
IndusInd Bank: RLLR: -- | 7.6% - 10%
Bank of Maharashtra: RLLR: 8.05 | 7% - 9.15%
Yes Bank: RLLR: -- | 7.4% - 10.54%
Karur Vysya Bank: RLLR: 8.8 | 8.5% - 10.65%
HDFC Bank: RLLR: -- | 7.75% - 13.2%
Axis Bank: RLLR: -- | 8% - 9.1%
IDBI Bank: RLLR: -- | 7.4% - 10%

Location : Mumbai

AGM Vijaylaxmi Group appoints Sussanne Khan to design WIZ commercial project

10 Oct 2026

AGM Vijaylaxmi Group has partnered with interior designer Sussanne Khan to develop the design identity of WIZ, its upcoming commercial project in Andheri East, Mumbai. The project draws inspiration from Art Deco, incorporating geometric patterns, symmetry, proportion and contemporary interiors rather than replicating the architectural style. Khan is working with the wider design team on elements including materials, furniture, lighting, artwork and detailing. WIZ is planned to offer commercial spaces across different budget ranges, supported by modern facilities and amenities, with a hospitality-led approach to the workplace environment. The development is intended to accommodate businesses of varying sizes and investors seeking a commercial address in western Mumbai. The group said the project forms part of its wider expansion across commercial, residential, redevelopment and mixed-use developments.Read more

cover photo

NMMT conducts cleanliness drive across 10 bus stations and public areas

10 Oct 2026

The Navi Mumbai Municipal Transport undertaking conducted a special cleanliness drive across 10 bus stations and public areas under the ‘Swachhata Hi Seva 2026’ initiative as part of the Seva Sankalp Abhiyan. The campaign began at 8 am and covered Belapur railway station, Nerul bus station, Airoli bus station, Vashi railway station, Koparkhairane bus station, CBD bus station, Sarsol bus station, Vashi bus station, Vashi Sector 7 and Artist Village. Officials and employees removed accumulated waste and unwanted material from passenger areas, roadsides and other public spaces. They also took a cleanliness pledge to promote civic awareness. The campaign was led by Transport Committee Chairman Vikas Zanjad, transport members and NMMT officials and employees, with planning and implementation under Transport Manager Umakant Jangale.Read more

cover photo

Navi Mumbai civic body conducts cleanliness and tree plantation drive at Parsik Hill

10 Oct 2026

The Navi Mumbai Municipal Corporation (NMMC) organised a cleanliness and tree plantation drive at Parsik Hill under its ‘Seva Sankalp Abhiyan’ and ‘Swachhata Hi Seva’ initiatives. More than 200 transgender citizens associated with Kinnar Maa Sevabhavi Trust and 75 NSS students from Sterling College of Pharmacy participated in the campaign on October 1. The drive included a cleanliness activity under the ‘Ek Din – Ek Ghanta – Ek Saath’ initiative and the planting of 50 native trees under ‘Ek Ped Maa Ke Naam’. NMMC officials highlighted the role of community participation in maintaining the city’s cleanliness and environment. A larger cleanliness campaign involving Shri members of Dr Shri Nanasaheb Dharmadhikari Pratishthan was also scheduled across Navi Mumbai’s gaothan areas on October 2, coinciding with Mahatma Gandhi Jayanti.Read more

cover photo

BEST receives only 736 of 4,500 contracted buses as Mumbai commuters face longer waits

Mumbai News Desk

09 Oct 2026

Mumbai’s BEST Undertaking is facing a major shortfall in its bus fleet, with only 736 of 4,500 buses contracted over the past four years delivered so far. The delayed supply has contributed to longer waiting times, with commuters reportedly waiting 30–45 minutes at several bus stops. BEST currently operates around 2,800 buses, including only 249 owned by the undertaking, while the rest are run under wet-lease arrangements. The transport utility is also awaiting additional electric buses as it works to expand its fleet and strengthen city connectivity.Read more

cover photo

Brookfield acquires eight industrial, logistics parks from ESR India for INR 4,300 crore

09 Oct 2026

Global investment firm Brookfield has acquired eight industrial and logistics parks from ESR India in a transaction involving an investment of INR 4,300 crore. The portfolio covers 10.5 million square feet across 400 acres and includes Grade A parks across Mumbai, Pune, Delhi-NCR, Chennai and Kolkata. Brookfield said the amount will cover both the acquisition and future development of the properties. The portfolio is around 98 per cent leased, while ESR India will continue to manage the assets in the near term.Read more

cover photo

Fire at BMC's Mulund PAP project labour camp triggers seven cylinder explosions

09 Oct 2026

A fire broke out at a ground-plus-one-storey labour camp at Tata Nagar on Navghar Road in Mulund East, Mumbai, on October 8, triggering the explosion of around seven gas cylinders and prompting the evacuation of workers from the premises. The camp accommodates construction workers engaged in the Brihanmumbai Municipal Corporation’s (BMC) Project Affected Persons (PAP) housing development. No injuries or fatalities were reported. The Mumbai Fire Brigade received information about the incident at 1.54 pm and classified it as a Level-I fire at 2.05 pm. Firefighters and other emergency personnel were deployed to contain the blaze and secure the site.Read more

cover photo

Versova-Yari Road bridge gets December 2027 completion deadline

09 Oct 2026

The Brihanmumbai Municipal Corporation (BMC) has set December 2027 as the deadline for completing the long-pending Versova-Yari Road bridge across Kavthe Creek in Andheri West. The 206-metre bridge, originally conceptualised in 2002, will provide a direct east-west connection between Yari Road, Panch Marg and Versova and areas including Lokhandwala and Sardar Vallabhbhai Patel Nagar. The project has faced prolonged delays over litigation, environmental permissions and land-related issues, while its estimated cost has increased significantly from the original proposal.Read more

cover photo

Ghatkopar road overbridge gets two-tier redesign, three pier caps to be demolished and rebuilt

09 Oct 2026

The under-construction Ghatkopar Road Overbridge in Mumbai is being redesigned after around 30% of the construction work was completed. The revised plan will create a two-tier bridge system, with a lower-level road overbridge for local east-west traffic and a raised, wider cable-stayed bridge for through traffic between the Andheri side and the Eastern Express Highway. Three pier caps - R, RP16 and RP17 will be partially demolished and rebuilt at a higher level to accommodate the revised configuration. The changes are intended to improve local connectivity and traffic movement.Read more

cover photo

Navi Mumbai airport strengthens ground connectivity ahead of October 25 flight schedule

09 Oct 2026

Navi Mumbai International Airport has announced an expanded ground transport network across Mumbai, Navi Mumbai, Pune and the wider Mumbai Metropolitan Region ahead of the winter flying schedule, which runs from 25 October to 27 March. Maharashtra State Road Transport Corporation will start electric bus services to Dadar, Borivali and Pune from 7 October, while Bharat Taxi begins operations on 10 October. Ground transport capacity is being raised to 4,689 vehicles. The Adani group-operated airport, which began operations last year, is also working on electric vehicle charging infrastructure.Read more

cover photo

JNPA restores normal traffic after surge in container cargo movement

09 Oct 2026

Jawaharlal Nehru Port Authority has said traffic at the port returned to normal after a brief congestion episode last week caused queues at terminal gates and delays in container movement. The disruption followed a sharp increase in export cargo arrivals and the bunching of more than 15 container vessels at terminal gates around the same time. JNPA and terminal operators responded with additional measures and coordination with container freight stations and local traffic authorities. Daily quay-side handling reached 35,307 TEUs on October 4, while average truck turnaround time fell to 1.47 hours.Read more

cover photo

Sayba Noor

09 Oct 2026

Mumbai City, India

Sayba Noor is a new-launch residential and retail project by Sayba Group located in Jogeshwari West, Mumbai, offering 1, 2, and 3 BHK apartments. Prices start from INR 1.35 Cr with possession scheduled to begin in June 2029.

View Website | Visit RERA website

cover photo

Vishal Dadlani sells Goregaon West commercial unit bought in 2016 for INR 3.25 crore

08 Oct 2026

Singer, songwriter and composer Vishal Dadlani has sold a commercial unit at Shalimar Miracle in Goregaon West, Mumbai, for INR 3.34 crore, according to property registration documents reviewed by Square Yards. The sale was registered in October 2026. Dadlani had bought the unit in 2016 for INR 3.25 crore, an overall gain of about 2.8 per cent over the holding period. The unit has a carpet area of 641 sq ft and a built-up area of 769.51 sq ft. The deal attracted stamp duty of INR 20.04 lakh.Read more

cover photo

Gami Pravah

08 Oct 2026

Mumbai City, India

Gami Pravah is a new-launch residential project in Versova, Mumbai, offering thoughtfully designed 2 and 3 BHK apartments across a 0.57-acre land parcel. Developed by Gami Group, the property features modern amenities, excellent connectivity via major roads, and a RERA possession timeline of December 2029.

View Website | Visit RERA website

cover photo

Mumbai court frames charges against builder in INR 28 crore flat fraud case

07 Oct 2026

A special MPID court in Mumbai has framed charges against developer Vijay Machhindar, his wife Komal and their company Ornate Spaces Pvt Ltd in an alleged INR 28 crore flat fraud case linked to the Grove Tower project in Oshiwara. The accused allegedly collected money from homebuyers and investors after promising possession of residential flats but failed to deliver the units or return the funds. The charges include cheating, criminal breach of trust, violations of the Maharashtra Ownership Flats Act and the Maharashtra Protection of Interest of Depositors Act, paving the way for trial.Read more

cover photo

Maharashtra targets 70 km of metro and elevated corridors in 2027, sets Sewri-Worli deadline

07 Oct 2026

Maharashtra Chief Minister Shri Devendra Fadnavis has directed infrastructure agencies to make 2027 the state’s “Metro Year”, with a target of completing at least 70 km of metro and elevated corridors during the year. The target for corridors scheduled for completion by December 2026 has also been raised from 36 km to 50 km through accelerated construction. The Sewri-Worli elevated connector has been given a May 31, 2027 deadline for completion and opening to traffic. The review also focused on mechanisation, skilled labour, utility mapping and faster execution of pending metro works across Mumbai.Read more

cover photo

Bombay HC urges state, public bodies to take up slum redevelopment on their own land

07 Oct 2026

The Bombay High Court on Tuesday said the state government and other public bodies should implement slum rehabilitation projects on their land, so that projects are not inordinately delayed by disputes between groups of slum dwellers and rival developers. The court referred to the pending redevelopment of Siddharth Nagar in Chembur, delayed for almost 20 years, and ordered the CEO of the Slum Rehabilitation Authority to decide within six weeks on applications challenging the appointment of Ruparel Buildcon as developer. The petition was filed by Ruparel Buildcon.Read more

cover photo

Raj Ratna CHS

07 Oct 2026

Mumbai City, India

Raj Ratna CHS is a new-launch residential project by DGS Group located in Borivali West, Mumbai, offering 1, 2, and 3 BHK flats. The property spans 0.23 acres with prices starting from INR 98.96 Lac, and possession is scheduled to begin in December 2029.

View Website | Visit RERA website

cover photo

Bombay High Court allows Ruparel Buildcon to continue as developer of Chembur SRA project

06 Oct 2026

The Bombay High Court has declined to enforce a February 2026 directive of the Slum Rehabilitation Authority (SRA) seeking the removal of Ruparel Buildcon as developer of a 16-acre slum rehabilitation project in Chembur. The project covers a federation of 33 slum societies and had already made substantial progress when the developer challenged the SRA action. The court held that agreements and consent terms forming the basis of the developer’s appointment could not simply be treated as unenforceable. At the same time, it said the writ proceedings could not determine whether there was genuine dissent among some slum occupants.Read more

cover photo

Adani Airports to begin phased redevelopment of Mumbai Terminal 1B's North Section from January 2027

06 Oct 2026

Mumbai International Airport Limited, operated by Adani Airport Holdings, will begin phased redevelopment of the North Section of Terminal 1B from January 2027, citing safety concerns over the nearly 60-year-old building, the company said on 3 October. The work will lift Terminal 1 capacity by 33 per cent to 20 million passengers annually. About five million of the airport's 55 million yearly passengers, or 9 per cent, will be temporarily affected, with cash vouchers planned for international passengers to offset a fee difference with Navi Mumbai.Read more

cover photo

MMRDA Completes Mumbai 3.0 and Mumbai 4.0 ELU Reports in Record Two-and-a-Half Months

06 Oct 2026

The Mumbai Metropolitan Region Development Authority (MMRDA) has completed three Existing Land Use (ELU) reports covering Mumbai 3.0 and Mumbai 4.0 in two-and-a-half months. The reports cover around 2,008 square kilometres across 565 villages in KSC New Town, Palghar’s Northern Extended Notified Area and Southern ENA in Raigad, including Alibag. Using LiDAR, high-resolution imagery, DGPS and GIS mapping, the reports provide data on land use, infrastructure, settlements and natural resources. The database will support master planning, development plans, digital twins, infrastructure planning, housing, employment and environmental protection across the region.Read more

cover photo