SBI Term Loan: RLLR: 8.15 | 7.25% - 8.55%
Canara Bank: RLLR: 8 | 7.15% - 9.85%
ICICI Bank: RLLR: -- | 8.5% - 9.65%
Punjab & Sind Bank: RLLR: 7.3 | 7.35% - 10.75%
Bank of Baroda: RLLR: 7.9 | 7.2% - 8.95%
Federal Bank: RLLR: -- | 7.35% - 9.6%
IndusInd Bank: RLLR: -- | 7.6% - 10%
Bank of Maharashtra: RLLR: 8.05 | 7% - 9.15%
Yes Bank: RLLR: -- | 7.4% - 10.54%
Karur Vysya Bank: RLLR: 8.8 | 8.5% - 10.65%
HDFC Bank: RLLR: -- | 7.75% - 13.2%
Axis Bank: RLLR: -- | 8% - 9.1%
IDBI Bank: RLLR: -- | 7.4% - 10%

Infrastructure News

Germany offers to partner with Indian companies for solar panel and battery manufacturing

09 Nov 2026

Germany has expressed interest in partnering with Indian companies to manufacture solar panels and batteries domestically, with the aim of strengthening India's renewable energy supply chain. German Ambassador Jasper Wieck said global energy supply disruptions had highlighted the need to reduce dependence on external sources. The proposal was discussed during the 20th anniversary of the Indo-German Energy Forum in New Delhi. The two countries are also looking to expand cooperation in green hydrogen, industrial capacity and renewable energy technologies.Read more

cover photo

Pune Metro projects worth INR 21,800 crore to expand connectivity across key employment and residential hubs

09 Nov 2026

Prime Minister Shri Narendra Modi is scheduled to inaugurate Pune Metro Line 3, also known as the Pink Line, and lay the foundation stone for four corridors under Phase II on November 3, 2026. The combined projects are valued at around INR 21,800 crore. The 23-km Pink Line, built at a cost exceeding INR 8,300 crore, will connect the Hinjewadi IT hub with Shivajinagar. Phase II, estimated at INR 13,500 crore, will extend the network across major residential, commercial and employment centres.Read more

cover photo

Madhya Pradesh bridge remains unusable three years after completion as link roads remain pending

09 Nov 2026

A 308-metre bridge over the Dudhi river in Madhya Pradesh’s Narmadapuram district remains largely unusable nearly three years after its completion, as connecting roads on both sides have not been built. Completed in December 2023 at a cost of around INR 8 crore, the bridge was intended to connect Narmadapuram with neighbouring Narsinghpur and benefit residents of 40 to 50 villages. The state government is yet to decide which agency will construct the approximately 2.7 km of outstanding link roads.Read more

cover photo

AdaniConneX in talks to raise USD 1.5 billion for data centre expansion

09 Nov 2026

Adani Group is seeking to raise approximately USD 1.5 billion through an offshore loan to finance its data centre expansion, with its joint venture AdaniConneX holding discussions with a group of international lenders. The proposed facility is being negotiated with banks including DBS, First Abu Dhabi Bank and Mitsubishi UFJ Financial Group, alongside other global financial institutions. The financing discussions come as the conglomerate plans to invest around USD 100 billion in data centres and other digital infrastructure by 2035.Read more

cover photo

EKA Mobility links electric bus production to depot and charging infrastructure readiness

09 Nov 2026

EKA Mobility is aligning its electric bus production with the availability of depot and charging infrastructure, as delays in power connections and site preparation hold up vehicle deliveries. The Pune-based manufacturer estimates it can deliver around 2,000 buses over the next two years from an order book of approximately 11,000. Chairman Sudhir Mehta said depot readiness typically takes about a year after an order is placed. The company is therefore adjusting manufacturing schedules to avoid accumulating buses that cannot yet be deployed.Read more

cover photo

Man Infraconstruction secures two EPC work orders worth INR 5.83 billion

09 Nov 2026

Man Infraconstruction Ltd has secured two engineering, procurement and construction (EPC) work orders with a combined value of INR 5.83 billion, equivalent to INR 583 crore. The company disclosed the contracts on November 3, 2026. The announcement confirms the aggregate value and number of work orders but does not specify the clients, project locations, construction scope or execution timelines. Details about the division of contract value between the two orders and their expected contribution to revenue have also not been disclosed. Further information will be needed to assess the projects’ operational and financial implications.Read more

cover photo

West Bengal minister seeks safety audit of Damodar railway bridge amid concerns over sand mining

09 Nov 2026

West Bengal Urban Development and Municipal Affairs Minister Shrimati Agnimitra Paul has written to railway authorities seeking a detailed safety assessment of the Damodar railway bridge, citing concerns that past illegal sand mining may have damaged its pillars and affected structural strength. The bridge connects Asansol with Adra and forms part of an important freight and coal corridor. The request comes after Indian Railways approved a project worth INR 223.58 crore to reconstruct the foundations and substructures of Bridge No. 520 in the Madhukunda–Damodar section, where the existing structures have shown signs of age-related distress.Read more

cover photo

Central Railway completes Kavach 4.0 safety assessment across 337 km of tracks in Maharashtra

08 Nov 2026

Central Railway has completed the Independent Safety Assessment of Kavach 4.0 across 337.46 route kilometres in its Pune, Solapur and Nagpur divisions. The latest assessment covered the 133.89-km Ahilyanagar–Yeola section in Pune division, following earlier assessments on the Amla–Chhindwara section in Nagpur division and the Daund–Kurduwadi section in Solapur division. Conducted by an Italy-based independent assessment team, the inspections tested the indigenous automatic train protection system’s safety functions, including overspeed protection, automatic braking and prevention of trains passing signals at danger.Read more

cover photo

Orascom Construction sets November share issuance date as OCI combination targets December completion

08 Nov 2026

Orascom Construction PLC expects to complete its proposed combination with Netherlands-based OCI N.V. in December 2026, following shareholder approvals from both companies. Under the announced timetable, Orascom Construction plans to issue 97.2 million new shares to OCI on November 24, with the shares to be listed on the Abu Dhabi Securities Exchange and Egyptian Exchange. The crediting of Orascom Construction shares to eligible OCI shareholder accounts is expected to begin on or around December 8. The schedule remains subject to regulatory approvals and other outstanding conditions.Read more

cover photo

NTPC plans 320 kW ceramic-based solar power pilot in Rajasthan’s Bhadla

08 Nov 2026

NTPC is setting up a 320 kW concentrated solar power pilot project at Bhadla Solar Park in Rajasthan, in collaboration with Rajasthan Renewable Energy Corporation Limited (RRECL). The project will test ceramic-based thermal energy storage technology designed to generate electricity after sunset using heat captured during the day. RRECL has approved the project, paving the way for preliminary feasibility studies, site surveys and structural testing. The electricity generated will be used entirely for internal and auxiliary consumption at the NTPC plant.Read more

cover photo