SBI Term Loan: RLLR: 8.15 | 7.25% - 8.55%
Canara Bank: RLLR: 8 | 7.15% - 9.85%
ICICI Bank: RLLR: -- | 8.5% - 9.65%
Punjab & Sind Bank: RLLR: 7.3 | 7.35% - 10.75%
Bank of Baroda: RLLR: 7.9 | 7.2% - 8.95%
Federal Bank: RLLR: -- | 7.35% - 9.6%
IndusInd Bank: RLLR: -- | 7.6% - 10%
Bank of Maharashtra: RLLR: 8.05 | 7% - 9.15%
Yes Bank: RLLR: -- | 7.4% - 10.54%
Karur Vysya Bank: RLLR: 8.8 | 8.5% - 10.65%
HDFC Bank: RLLR: -- | 7.75% - 13.2%
Axis Bank: RLLR: -- | 8% - 9.1%
IDBI Bank: RLLR: -- | 7.4% - 10%

West Bengal minister seeks safety audit of Damodar railway bridge amid concerns over sand mining

#Infrastructure News#Infrastructure#India#West Bengal
Synopsis

West Bengal Urban Development and Municipal Affairs Minister Shrimati Agnimitra Paul has written to railway authorities seeking a detailed safety assessment of the Damodar railway bridge, citing concerns that past illegal sand mining may have damaged its pillars and affected structural strength. The bridge connects Asansol with Adra and forms part of an important freight and coal corridor. The request comes after Indian Railways approved a project worth INR 223.58 crore to reconstruct the foundations and substructures of Bridge No. 520 in the Madhukunda–Damodar section, where the existing structures have shown signs of age-related distress.

West Bengal Urban Development and Municipal Affairs Minister Shrimati Agnimitra Paul has written to railway authorities seeking a detailed safety audit of a railway bridge over the Damodar river, amid concerns that past illegal sand mining may have weakened its structure. Shrimati Paul said she feared that extensive mining activity could have damaged the bridge pillars and affected their structural integrity. She called for a thorough assessment in the interest of public safety. The request places renewed attention on the condition of railway infrastructure in the region, where the bridge supports an important connection between Asansol and Adra. 
The concern centres on the possibility that unscientific sand extraction near the bridge may have affected its foundations or supporting structures. However, the reported damage remains a concern raised by the minister and should not be treated as a confirmed engineering finding. A technical inspection would be needed to establish whether mining activity has affected the bridge, assess the extent of any deterioration and determine whether additional repair or protection measures are required. The request also comes against the background of complaints about illegal sand mining in West Bengal in previous years. The railway authorities’ assessment, if undertaken, would help clarify the bridge’s current condition and the nature of any remedial work required. 
Indian Railways had announced a separate infrastructure-strengthening project worth INR 223.58 crore for Bridge No. 520, covering the up and down line substructures in the Madhukunda–Damodar section under South Eastern Railway’s Adra division. The project includes reconstruction of foundations and substructures, along with associated yard remodelling and track works on the bridge approaches. Railway authorities have previously stated that the existing bridge structures have aged considerably and show signs of structural distress. The down-line bridge dates to 1903, while the up-line bridge was constructed in 1965. These conditions have made structural strengthening necessary to support continued railway operations. 
The bridge section is an important link between Asansol and Tatanagar and forms part of a freight feeder route and the Sini–Purulia–Asansol coal corridor. It carries substantial rail traffic and supports the movement of coal and other goods serving industrial facilities in the Durgapur–Asansol belt. These include the IISCO steel plant, cement manufacturing operations and thermal power units. Maintaining the bridge’s structural reliability is therefore important not only for railway safety but also for freight connectivity and industrial supply chains. Disruptions on this section could affect the movement of goods and the reliability of rail services serving the wider region. 
The minister’s request for a safety audit and the previously approved strengthening project address related but distinct issues. The existing project focuses on rebuilding the bridge’s foundations and substructures, while the requested audit would examine the bridge’s condition in light of concerns about possible damage from sand mining. The available information does not confirm whether railway authorities have agreed to conduct a separate investigation or when an assessment might begin. Any further decision will depend on technical findings and the railway administration’s review. The results could help establish whether the planned structural works adequately address the identified risks or whether additional measures are needed to protect the bridge and maintain safe operations. 
Source PIB

Discussion

Have something to say? Post your comment