13 Nov 2026
The Navi Mumbai Municipal Corporation (NMMC) has secured the first position among India’s cleanest cities in the Swachh Survekshan 2025-26, conducted under the Swachh Bharat Mission–Urban. The award was presented by President Droupadi Murmu at a ceremony in New Delhi, where Mayor Sujata Patil received the recognition along with Deputy Mayor Dashrath Bhagat and Municipal Commissioner Dr Kailas Shinde. The civic body has also retained the seven-star Garbage-Free City rating and Water Plus certification under the open defecation-free category. Its performance has been supported by scientific processing of all daily municipal waste, wastewater recycling, digital monitoring systems, citizen participation and year-round cleanliness initiatives.Read more
13 Nov 2026
The Andhra Pradesh Capital Region Development Authority (APCRDA) signed a memorandum of understanding (MoU) with Indian Oil Corporation Limited (IOCL) on November 10, 2026, to develop an integrated green energy framework for Amaravati. The agreement will cover joint studies and implementation plans for city gas distribution, including piped natural gas (PNG) and compressed natural gas (CNG), electric vehicle charging, battery swapping stations, compressed biogas, green hydrogen and other low-carbon energy solutions. The two organisations will also prepare an Integrated Energy Master Plan to assess the capital city's present and future energy requirements. The partnership will explore multi-fuel energy stations, smart energy management systems and utility corridors, with a joint working group responsible for monitoring progress and preparing technical studies and detailed project reports.Read more
13 Nov 2026
The Mumbai Metropolitan Region Development Authority (MMRDA) has completed 67% of the physical work on the 7.35-km, six-lane elevated link road connecting Atal Setu with the Mumbai–Pune Expressway. The project is expected to reduce travel time between South Mumbai and Pune by approximately 60–90 minutes once operational. It will also ease congestion at Panvel junction and improve connectivity to Navi Mumbai International Airport, Pune, Goa and Jawaharlal Nehru Port. Construction is progressing across the Chirle and Palaspe sections, with foundation and structural works at different stages of completion. The project forms part of MMRDA’s broader regional connectivity strategy under its ‘Mumbai in 59 Minutes’ vision.Read more
13 Nov 2026
Tamil Nadu's Transport Department has imposed fines totalling INR 26.27 lakh on 1,826 private omni buses for violations detected during the Deepavali travel rush. The enforcement drive resulted in 17 buses being impounded and INR 70.81 lakh being recovered in pending road-tax dues. More than 70 special teams comprising regional transport officers and motor vehicle inspectors conducted inspections across the state, including Chennai, Madurai and Coimbatore. The violations included excessive passenger fares, safety-related lapses and non-payment of road taxes.Read more
13 Nov 2026
The Union Cabinet has approved the development of the Yuge Yugeen Bharat Museum at Delhi's historic North and South Block complex at an estimated cost of INR 3,230 crore. Envisaged as a major cultural institution showcasing India's civilisational heritage, the museum will have a proposed built-up area of approximately 1,78,509 square metres and the world's largest museum display area. The project will be implemented between financial years 2026-27 and 2030-31, with its first gallery expected to open to the public in 2027.Read more
13 Nov 2026
Meito Co., Ltd. plans to invest approximately 8 billion yen in a new ice cream plant at its existing Fukuoka facility, as it looks to expand sales beyond Kyushu and respond to rising demand for private-label products. The plant will be built in Fukutsu City, with construction scheduled to begin in June 2027 or later and operations expected from February 2029 or later. The investment will be funded through internal resources and is expected to have a minimal impact on the company’s current fiscal-year results.Read more
13 Nov 2026
The Union Cabinet has approved an 8.449 km extension of the Noida Metro Aqua Line from Noida Sector 51 to Greater Noida Sector 4, adding five elevated stations to the network. The project will provide metro connectivity to residential areas, commercial centres, IT offices, educational institutions and healthcare facilities across the corridor. It will also include an interchange with the Delhi Metro Blue Line at Noida Sector 61. Once operational, the extension will take the combined active metro network in Noida and Greater Noida to 71.878 km.Read more
13 Nov 2026
Maharashtra Chief Minister Devendra Fadnavis has proposed a phased redevelopment of Mumbai's Chhatrapati Shivaji Maharaj International Airport Terminal 1 (T1), suggesting that replacement infrastructure be developed before existing facilities are demolished. The proposal aims to prevent flight cancellations and avoid shifting international operations to Navi Mumbai International Airport. Fadnavis has written to the Union Civil Aviation Ministry outlining an alternative construction sequence, amid concerns raised by international airlines over the airport operator's proposed transition plan.Read more
13 Nov 2026
The Supreme Court-appointed Central Empowered Committee has recommended a time-bound roadmap to phase out unsustainable sand extraction from active river channels over three years, along with sustainable alternative sources of sand and aggregates. It suggests scientific desiltation of dams and reservoirs and recycling of construction and demolition waste. The recommendations are in a report submitted to the court on November 2 in a case on illegal sand mining in the National Chambal Sanctuary. The committee says sand and gravel are crucial for construction but excessive extraction damages rivers, and there is no reliable national database of illegal extraction.Read more
13 Nov 2026
The Delhi Development Authority (DDA) is targeting year-end to complete outstanding works and handover of its East Delhi Hub at Karkardooma. The 30-hectare transit-oriented development project is nearing completion, with Lieutenant Governor Taranjit Singh Sandhu directing officials to expedite pending statutory clearances. The development includes 1,026 premium two-bedroom apartments, commercial spaces and civic amenities. While residential and commercial construction is in its final stages, landscaping, common-area development and the transfer of the site from NBCC to DDA remain among the pending activities.Read more
13 Nov 2026
Andhra Pradesh Chief Minister Shri N Chandrababu Naidu held talks with Singapore Minister of State Gan Siow Huang on advancing Amaravati's integrated township development, digital governance through the Real Time Governance Society, and capacity building. The meeting took place on the sidelines of the 31st CII Partnership Summit in Visakhapatnam, which runs on November 12 and 13 with delegates from nearly 58 countries and is expected to attract investments of up to INR 11 lakh crore. Singapore has helped plan Amaravati for years, and the two sides renewed their partnership last year.Read more
13 Nov 2026
The Maharashtra State Consumer Disputes Redressal Commission has directed Bombay Realty and The Bombay Dyeing and Manufacturing Company to jointly and severally refund INR 1.95 crore to two homebuyers who cancelled their booking in the Two ICC project at Dadar East, Mumbai, in 2016 following construction delays and a dispute over the payment schedule. The commission also ordered 9% annual interest from the respective dates of deposit, INR 1 lakh as compensation and INR 50,000 towards litigation costs.Read more
13 Nov 2026
The Ministry of Railways has concluded its year-long celebrations marking 150 years of Vande Mataram, with a cultural programme at Rail Bhawan on 5 November 2026. Organised in four phases, the observance included mass singing, an essay competition, a quiz and a Tiranga Rally. The closing programme saw winners of the essay and quiz competitions receive prizes and merit certificates, while the Railway Board Cultural Group was also recognised for its contribution to organising activities throughout the year.Read more
13 Nov 2026
The Union Cabinet has approved the development of the Yuge Yugeen Bharat Museum at the historic North and South Block Complex in New Delhi, with an estimated investment of INR 3,230 crore. Spread across approximately 1,78,509 square metres, the museum will be developed through the adaptive reuse of the existing government buildings while retaining their architectural and heritage character. The project will be implemented in phases between FY 2026-27 and FY 2030-31, with its first gallery expected to open in late 2027.Read more
13 Nov 2026
Pattali Makkal Katchi (PMK) president Anbumani Ramadoss has written to Union Railway Minister Ashwini Vaishnaw seeking accelerated implementation of 19 pending railway infrastructure projects across Tamil Nadu. The projects, comprising eight new railway lines, eight track-doubling works and three gauge-conversion schemes, have a combined estimated cost of INR 27,282 crore. As of April 1, 2026, cumulative expenditure stood at INR 8,811 crore, according to figures cited by Ramadoss. The eight new-line projects cover 811 km, but only 24 km has been completed. He attributed the delays to inadequate project-specific funding and pending land acquisition and proposed a dedicated committee comprising Union and state government officials, experts and district administrations to monitor implementation and submit monthly progress reports.Read more
13 Nov 2026
A INR 250 crore master plan has been prepared for the comprehensive development of the Sri Dattatreya temple at Deval Ganagapur in Afzalpur taluk of Kalaburagi district, according to reports of 10 November. The first phase, estimated at INR 50 crore, covers a Sangam Ghat facelift, works at Papavinash Teertha, a promenade, parking and transit facilities, a pedestrian pathway and temple complex upgrades. The Detailed Project Report and designs were prepared under Home Minister Priyank Kharge. The proposal is awaiting cabinet approval, which Deputy Commissioner Ikram Sharief expects shortly. The plan aims to improve infrastructure for the thousands of devotees who visit every day from Karnataka and neighbouring states.Read more
13 Nov 2026
The Haryana Department of Town and Country Planning (DTCP) has issued show-cause notices to the owners of three buildings operating as paying guest (PG) accommodations in an unauthorised colony in Manesar, Gurugram, following an inspection by the Chief Minister's Flying Squad. The department alleged that the buildings were constructed without the mandatory licence and approvals under the Haryana Development and Regulation of Urban Areas Act, 1975. The owners have been directed to immediately stop further construction and appear before the District Town Planner (Enforcement) within seven days to explain the alleged violations. They have also been asked to submit authenticated property ownership, land revenue and building approval documents. The action forms part of DTCP's wider enforcement drive against unauthorised colonies and commercial activities operating without planning permissions.Read more
13 Nov 2026
Indian Railways earned Rs 628.49 crore from scrap disposal during Special Campaign 6, a month-long cleanliness and administrative efficiency drive held from 2 to 31 October, the Ministry of Railways said on Monday. The amount is above the campaign target of Rs 600 crore. Removing scrap, obsolete equipment and unwanted material freed up 6,20,121 square feet of space across railway establishments, which is about 14.24 acres. The railways also disposed of more than 1.5 lakh units of e-waste, which brought in a further Rs 10.43 crore. The drive covered more than one lakh cleanliness drives, record management and the disposal of pending matters.Read more
13 Nov 2026
The Noida Authority has temporarily suspended the proposed shared area maintenance (SAM) charges at Jaypee Wish Town following protests by residents over the additional financial burden. The decision was taken during a tripartite meeting involving the authority, police officials, Suraksha Realty and residents on 4 November 2026. The developer had proposed a monthly SAM levy of INR 1.50 per sq ft from November, over and above the existing common area maintenance (CAM) charge of INR 3.20 per sq ft. Residents argued that the additional levy could result in duplication of maintenance expenses and increase monthly bills from around INR 6,000 to INR 10,000. The authority has also directed a review of property transfer charges and temporarily restricted the developer from issuing no-objection certificates (NOCs) until the inquiry is completed.Read more
13 Nov 2026
The Indore Municipal Corporation (IMC) has demolished unauthorised structures being developed as part of an alleged illegal residential colony in Khajrana, under Zone 8, following information about construction activity without the required approvals. The enforcement operation was carried out on November 10, 2026, on the directions of Municipal Commissioner Kshitij Singhal. The civic body's removal team dismantled drainage lines and other construction work, including columns erected on the site, before the proposed colony could be further developed. The land, identified as Khasra No. 523/2 in Khajrana village, is registered in the names of four individuals, according to revenue records. The operation forms part of IMC's continuing enforcement campaign against unauthorised layouts and illegal construction across Indore.Read more