SBI Term Loan: RLLR: 8.15 | 7.25% - 8.55%
Canara Bank: RLLR: 8 | 7.15% - 9.85%
ICICI Bank: RLLR: -- | 8.5% - 9.65%
Punjab & Sind Bank: RLLR: 7.3 | 7.35% - 10.75%
Bank of Baroda: RLLR: 7.9 | 7.2% - 8.95%
Federal Bank: RLLR: -- | 7.35% - 9.6%
IndusInd Bank: RLLR: -- | 7.6% - 10%
Bank of Maharashtra: RLLR: 8.05 | 7% - 9.15%
Yes Bank: RLLR: -- | 7.4% - 10.54%
Karur Vysya Bank: RLLR: 8.8 | 8.5% - 10.65%
HDFC Bank: RLLR: -- | 7.75% - 13.2%
Axis Bank: RLLR: -- | 8% - 9.1%
IDBI Bank: RLLR: -- | 7.4% - 10%

ADNOC’s new Hormuz bypass pipeline targets early 2027 start to expand crude export capacity

#Infrastructure News#Industrial#United Arab Emirates
Synopsis

Abu Dhabi National Oil Company (ADNOC) is preparing to begin transporting some Upper Zakum crude through a new pipeline bypassing the Strait of Hormuz in early 2027, according to reports citing people familiar with the matter. The West-East 1 pipeline will route offshore crude to Fujairah on the Gulf of Oman, allowing shipments to reach customers without transiting the strategic waterway. The project is expected to double ADNOC’s crude export capacity through Fujairah and strengthen the UAE’s energy supply resilience.

Abu Dhabi National Oil Company (ADNOC) is targeting early 2027 to begin supplying some Upper Zakum crude through a new pipeline that bypasses the Strait of Hormuz, potentially expanding the United Arab Emirates’ ability to transport oil to international markets without relying on the strategic shipping route. 
According to reports citing people familiar with the matter, ADNOC has informed some Asian refiners that supplies of Upper Zakum crude could begin arriving at the Fujairah terminal during the first months of 2027. The crude is produced from offshore fields in the Persian Gulf, and its exports would ordinarily require shipments to pass through the Strait of Hormuz. 
The planned pipeline, known as West-East 1, will connect oil production and transportation infrastructure with Fujairah, located on the Gulf of Oman outside the strait. Once operational, the line is expected to double ADNOC’s crude export capacity through Fujairah, providing an additional route for moving oil to overseas buyers. 
The development follows an acceleration of construction announced in May 2026. ADNOC had said the pipeline was expected to be ready in 2027, while chief executive Sultan Al Jaber subsequently indicated that construction was nearly 50% complete. The company has not publicly confirmed the more specific early-2027 start-up timeline and declined to comment on the latest reports. 
ADNOC currently operates the Habshan-Fujairah pipeline, which can transport up to 1.8 million barrels of crude oil per day. The existing infrastructure carries Murban crude produced from onshore fields in Abu Dhabi to Fujairah. By contrast, offshore grades such as Upper Zakum have generally required different export arrangements, including shipments through the Strait of Hormuz. 
The new pipeline is expected to enable selected Upper Zakum supplies to be delivered to Asian customers under term agreements, allowing buyers to load cargoes at Fujairah without sending vessels through the strait. The arrangement could offer refiners greater certainty over deliveries from the UAE amid continued disruption and security risks affecting shipping in the region. 
The project has wider implications for the UAE’s energy strategy. The country has been working to strengthen its ability to export crude through routes outside the Strait of Hormuz, a key maritime corridor for global oil supplies. The additional pipeline capacity also supports its broader ambition to increase oil production capacity to five million barrels per day by 2027. 
However, the new route will not eliminate the region’s wider dependence on the strait, as other Gulf producers lack comparable alternative export infrastructure. The extent to which the project improves supply flexibility will depend on its start-up schedule, the pace at which volumes increase and the capacity of associated export facilities. 
The early-2027 timeline would mark an important step in expanding ADNOC’s options for delivering offshore crude to international markets, particularly Asian refiners, while reducing the need for some shipments to transit the Strait of Hormuz.

Discussion

Have something to say? Post your comment