The Gulf conflict has disrupted global supply chains, pushed...
REITs have changed the way commercial real estate is owned a...
What really powers the cloud? Behind every Google search, A...
What really powers the cloud? Behind every Google search, A...
Luxury real estate is one of the most talked-about segments ...
The Amaravati Development Corporation has instructed engineering officials to strengthen flood prevention measures across the capital region following increased water flow caused by Cyclone Murasu. ADC Chairperson and Managing Director D. Lakshmiparthasarathy reviewed the situation at Kondavitivagu, Palavagu, Perammavagu and Kotellavagu. Officials also briefed her on the discharge of 180 cusecs of floodwater from Undavalli into the Krishna River and measures to drain water from the Penumaka Reservoir. The inspection also covered diversion arrangements near the West Bypass and Neerukonda Reservoir.
The Amaravati Development Corporation (ADC) has directed officials to strengthen flood prevention measures across the capital region following heavy water flow in several streams due to Cyclone Murasu. ADC Chairperson and Managing Director D. Lakshmiparthasarathy issued the instructions during a field inspection of floodwater movement through key waterways and drainage channels in Amaravati.
On Tuesday, Lakshmiparthasarathy, accompanied by engineering officials, inspected the flow of floodwater in Kondavitivagu, Palavagu, Perammavagu and Kotellavagu. The inspection focused on the movement of water through these streams and the measures being taken to prevent flooding in the capital region.
She instructed officials to ensure that floodwater entering from the border areas flows through the diversion channel around the Neerukonda Reservoir without any obstruction. The direction was aimed at maintaining the smooth movement of excess water and avoiding blockages along the drainage route.
ADC Chief Engineer Mojes Kumar, who is supervising storm-related duties, informed the CMD that around 180 cusecs of floodwater reaching Undavalli was being discharged into the Krishna River through the pumping station escapes.
Chief Engineer B. Narasimha Murthy said officials were taking all possible measures to release the floodwater entering the Penumaka Reservoir into the Krishna River.
Meanwhile, Chief Engineers R. Gopalakrishna Reddy and CH. Dhananjaya explained that floodwater flowing through Kondavitivagu and the N-10 and N-11 roads, which intersect at the West Bypass, was being diverted in coordination with the concerned authorities.
The inspection highlighted the importance of maintaining clear drainage routes and coordinating water discharge across the capital region during periods of heavy rainfall. The diversion channels, pumping station escapes and reservoir drainage arrangements are important parts of Amaravati's flood management measures. Their effective operation will be essential to prevent water accumulation in low-lying areas and protect ongoing infrastructure and development activities in the capital region as adverse weather conditions continue.
Source APCRDA
15th Nov, 2026
14th Nov, 2026
13th Nov, 2026