SBI Term Loan: RLLR: 8.15 | 7.25% - 8.55%
Canara Bank: RLLR: 8 | 7.15% - 9.85%
ICICI Bank: RLLR: -- | 8.5% - 9.65%
Punjab & Sind Bank: RLLR: 7.3 | 7.35% - 10.75%
Bank of Baroda: RLLR: 7.9 | 7.2% - 8.95%
Federal Bank: RLLR: -- | 7.35% - 9.6%
IndusInd Bank: RLLR: -- | 7.6% - 10%
Bank of Maharashtra: RLLR: 8.05 | 7% - 9.15%
Yes Bank: RLLR: -- | 7.4% - 10.54%
Karur Vysya Bank: RLLR: 8.8 | 8.5% - 10.65%
HDFC Bank: RLLR: -- | 7.75% - 13.2%
Axis Bank: RLLR: -- | 8% - 9.1%
IDBI Bank: RLLR: -- | 7.4% - 10%

Pradhan urges Gadkari to approve NH-55 six-laning, four underpasses and Sambalpur flyover

#Infrastructure News#Infrastructure#India#Odisha
Synopsis

Sambalpur MP Shri Dharmendra Pradhan has urged Union Road Transport and Highways Minister Shri Nitin Gadkari to grant administrative and financial approval for three highway infrastructure proposals in western Odisha, citing rising passenger and freight movement and road-safety concerns. The proposals include widening the Sambalpur-Angul-Cuttack corridor of National Highway 55 from four lanes to six lanes with two-lane service roads on both sides, construction of four underpasses on the Angul-Sambalpur section of NH-55, and a flyover at Sambalpur City Railway Station Square on NH-53. Pradhan has asked the ministry and the National Highways Authority of India (NHAI) to process the proposals on priority.

In a letter to Shri Gadkari on Tuesday, Pradhan sought the six-laning of the Sambalpur-Angul-Cuttack stretch of NH-55 along with two-lane service roads on either side of the highway. The corridor is an important road link for western Odisha, connecting the region with major industrial, commercial and urban centres. According to Pradhan, the route is witnessing increasing passenger movement as well as freight traffic linked to mining and industrial activity. The proposed widening is intended to address growing traffic volumes and improve the movement of people and goods along the corridor. 
Pradhan has also sought approval for four underpasses along the Angul-Sambalpur section of NH-55. The proposed locations are Jindal Road, Jarapada, Jeranga and Charmal. The proposals have been prepared by the Project Implementation Unit in Sambalpur and are being sought as long-term road-safety measures. The MP highlighted the interaction between heavy mining and commercial vehicles and local traffic and pedestrians along the corridor. Underpasses at the identified locations are intended to provide safer movement across the highway while reducing potential conflicts between local traffic and vehicles using the national highway. 
The third proposal relates to construction of a flyover at Sambalpur City Railway Station Square on NH-53. Pradhan has identified the location as an area with heavy pedestrian and vehicular movement and a potential black spot from a road-safety perspective. The proposed flyover is intended to address congestion and improve the movement of traffic through the junction. The intervention would form part of the broader effort to strengthen highway infrastructure in and around Sambalpur as traffic generated by the city, surrounding industrial areas and regional economic activity continues to increase. 
Pradhan has requested Shri Gadkari to direct the Ministry of Road Transport and Highways and NHAI to complete the required administrative and financial approvals for the three proposals on priority. The requests cover both capacity augmentation and targeted infrastructure interventions, with the six-laning proposal addressing the broader corridor requirement while the underpasses and flyover target specific traffic and safety issues. Timely implementation, according to Pradhan, would help reduce bottlenecks, improve road safety and facilitate the movement of passengers and freight across western Odisha. 
The proposals also reflect the growing infrastructure requirements of a region where mining, industrial activity and commercial movement are contributing to higher traffic demand on key highway corridors. The requested service roads, grade-separated crossings and flyover are intended to improve the interaction between through traffic and local movement. Approval from the central ministry and subsequent implementation through the highway authorities would be required before the proposed works can move into execution.

Discussion

Have something to say? Post your comment