SBI Term Loan: RLLR: 8.15 | 7.25% - 8.55%
Canara Bank: RLLR: 8 | 7.15% - 9.85%
ICICI Bank: RLLR: -- | 8.5% - 9.65%
Punjab & Sind Bank: RLLR: 7.3 | 7.35% - 10.75%
Bank of Baroda: RLLR: 7.9 | 7.2% - 8.95%
Federal Bank: RLLR: -- | 7.35% - 9.6%
IndusInd Bank: RLLR: -- | 7.6% - 10%
Bank of Maharashtra: RLLR: 8.05 | 7% - 9.15%
Yes Bank: RLLR: -- | 7.4% - 10.54%
Karur Vysya Bank: RLLR: 8.8 | 8.5% - 10.65%
HDFC Bank: RLLR: -- | 7.75% - 13.2%
Axis Bank: RLLR: -- | 8% - 9.1%
IDBI Bank: RLLR: -- | 7.4% - 10%

Gujarat CM launches INR 583.85 crore development projects in Ahmedabad

#Infrastructure News#Infrastructure#India#Gujarat#Ahmedabad
Synopsis

Gujarat Chief Minister Shri Bhupendra Patel inaugurated and laid foundation stones for 12 development projects worth a combined INR 583.85 crore in Ahmedabad on September 24, covering transport infrastructure, housing, drainage, emergency services and electric public transport. Six completed projects worth INR 279.80 crore were inaugurated, while foundation stones were laid for six projects estimated at INR 304.05 crore. The projects are being implemented by the Ahmedabad Municipal Corporation (AMC) and include a four-lane flyover at Vadaj Junction, a railway overbridge on the Ahmedabad-Botad railway line, affordable housing, road network development, drainage infrastructure and electric bus facilities.

Among the completed works inaugurated was a four-lane flyover at Vadaj Junction in Ahmedabad's West Zone, constructed at a cost of INR 127.92 crore. Another major transport project is the four-lane railway overbridge at level crossing 24 on the Ahmedabad-Botad railway line in the South-West Zone, developed at a cost of INR 98.60 crore. The package also includes 329 economically weaker section houses at TP-39 in Thaltej, constructed under the Pradhan Mantri Awas Yojana at INR 22.24 crore. In addition, the civic body commissioned 15 first-response vehicles for Ahmedabad fire stations at INR 19.74 crore and 10 engine-equipped boats for emergency response services at INR 3.40 crore. A rehabilitation project comprising 108 houses and 46 shops at Pakhajino Kuvo in Shahibaug was also inaugurated at INR 7.90 crore. 
The six projects receiving foundation stones have a combined estimated cost of INR 304.05 crore. These include INR 72.78 crore for road network development in the Ramapir Tekra Local Area Plan area of Stadium Ward and INR 65.51 crore for rehabilitation of an 1,800-mm drainage line between Nagarvel Hanuman Temple and Guruji Bridge. Another INR 61.81 crore has been earmarked for a drainage pumping station and rising line at Navana in Vatva. The package also includes an INR 61.89 crore AMTS/BRTS electric-bus charging station and parking facility at TP-110 in Nikol-Kathwada and an INR 28.08 crore bus depot, parking and charging station near the SP Ring Road. These projects add road, drainage and public transport infrastructure to the ongoing urban development programme in Ahmedabad. 
The remaining project in the foundation-stone package is a Tourism Temple Circuit along the eastern bank of the Sabarmati River, estimated to cost INR 13.98 crore. The circuit is planned to connect Saptarishi Ashram, Jagannath Temple and Atal Ghat. The broader package therefore combines conventional transport infrastructure with drainage, public housing, emergency-response assets and electric public transport facilities. The Vadaj flyover and Makarba railway overbridge are among the transport assets already brought into operation, while the proposed road and drainage works are at the foundation stage. The electric-bus facilities are intended to provide charging and parking infrastructure for Ahmedabad's public transport system as the city expands its electric mobility network. 
The programme was held under the 'Seva, Sankalp and Samarpan Abhiyan', with the event also featuring a draw for newly constructed houses and the distribution of appointment letters to more than 450 assistant technical supervisors and around 50 junior clerks in the Ahmedabad Municipal Corporation. The development package brings together projects across multiple parts of the city rather than being concentrated on a single infrastructure corridor. With the six inaugurated works now completed and six additional projects entering the implementation stage, the INR 583.85 crore programme covers a mix of mobility, urban services, housing and civic infrastructure. 
Source PTI

Discussion

Have something to say? Post your comment