The Gulf conflict has disrupted global supply chains, pushed...
REITs have changed the way commercial real estate is owned a...
What really powers the cloud? Behind every Google search, A...
What really powers the cloud? Behind every Google search, A...
Luxury real estate is one of the most talked-about segments ...
30 Oct 2026
The upcoming Mohali-Sirhind greenfield highway is expected to reduce travel time between Chandigarh-Mohali and Bathinda by around two hours by shortening the road distance from approximately 231 km to 135 km. Being developed by the National Highways Authority of India (NHAI) under the Bharatmala Pariyojana, the proposed 135-km access-controlled corridor is estimated to cost INR 5,200 crore. Its first phase, a 27.37-km stretch between Mohali and Sirhind, was reported to be nearly 80 per cent complete, with an opening targeted by the end of 2026.Read more
30 Oct 2026
Himachal Pradesh Assembly Speaker Shri Kuldeep Singh Pathania has urged Union Road Transport and Highways Minister Shri Nitin Gadkari to grant National Highway status to a strategic road corridor linking Shahpur, Draman, Singhuta, Chuwari, Chamba, Jot, Tissa, Sach and Pangi. During a meeting in New Delhi, he also sought approval for a tunnel between Chuwari and Chamba, citing the route’s importance for defence logistics, regional connectivity and tourism. Shri Gadkari said the Centre was finalising its policy and criteria for declaring new National Highways and that the proposal would be considered after the guidelines were completed.Read more
30 Oct 2026
The Ministry of Road Transport and Highways (MoRTH) has introduced an annual concessional local FASTag pass for eligible non-commercial vehicle owners living within 20 km of a National Highway toll plaza. Effective November 1, 2026, the pass will cost INR 1,500 annually at toll plazas outside municipal limits and INR 3,000 at plazas within municipal limits. The new option will allow eligible residents to choose between the existing monthly pass and the annual concession for a specific toll plaza. The facility is subject to conditions, including the availability of alternative roads and the applicable toll collection system.Read more
30 Oct 2026
The Maharashtra government has established three committees to oversee the implementation of its Artificial Intelligence (AI) Policy 2026. A state-level steering committee will provide strategic direction, while an executive committee will approve incentives and subsidies for eligible AI projects. A technical committee will assess proposals for compliance and eligibility before recommending them for approval and monitoring sanctioned projects. The government will also introduce an online portal to support implementation. Announced on May 6, the policy aims to expand AI adoption and encourage AI-based initiatives across government departments.Read more
30 Oct 2026
Tata Power Delhi Distribution Ltd and the National Capital Region Transport Corporation (NCRTC) have signed a memorandum of understanding to relocate electrical utilities along the proposed 136.3-km Delhi–Panipat–Karnal Namo Bharat corridor. The shifting work is scheduled to be completed within a year of its commencement. The corridor is planned to have 21 stations across Delhi and Haryana, with trains designed for speeds of up to 180 kmph. The project involves relocating or adjusting transmission lines, transformers and other electrical equipment to enable construction while maintaining power supply reliability.Read more
29 Oct 2026
Tata Power Company Ltd has signed a Memorandum of Understanding with Bharat Petroleum Corporation Ltd (BPCL) to develop 110 kV power infrastructure for BPCL's Petro Resid Fluidised Catalytic Cracking Unit (PRFCCU) project at its Mumbai refinery. The proposed infrastructure will meet the unit's 90 MW power requirement and involve an estimated investment of INR 250 crore. The work is expected to take approximately 24 months, subject to applicable approvals and project milestones. The PRFCCU project has a processing capacity of 3 million metric tonnes per annum and an estimated outlay of INR 14,203 crore.Read more
29 Oct 2026
Telangana's Chief Secretary said the state is inviting more than 550 domestic and international companies to the Invest Telangana Global Summit 2026, to be held at Future City on December 7, 8 and 9. A curtain-raiser in New Delhi on October 29 will be attended by Chief Minister Shri A Revanth Reddy. The summit will give special emphasis to defence and aerospace, with about 100 firms invited to a Raksha Expo, and the venue is being divided into 25 sectors. The state says the aim is to attract investment and create jobs.Read more
29 Oct 2026
Akasa Air will shift its Mumbai–Jeddah flight operations from Chhatrapati Shivaji Maharaj International Airport (CSMIA) to Navi Mumbai International Airport (NMIA) in a phased transition beginning December 2026. The airline and Adani Airport Holdings Ltd (AAHL) announced the move on October 26, with bookings opening the same day through the airline’s website, mobile app and online travel agencies. The relocation is part of a wider plan to transfer around 5 million passengers to NMIA during the first phase, creating capacity for the redevelopment of CSMIA’s Terminal 1 while expanding international connectivity from the Mumbai Metropolitan Region.Read more
29 Oct 2026
Infrastructure projects costing more than INR 150 crore each recorded a cumulative cost overrun of about INR 3.22 lakh crore, according to the government's monthly report for September 2026. Of 1,853 ongoing projects across 17 central ministries, the total revised cost is INR 37.56 lakh crore against an original INR 34.34 lakh crore. Spending so far is INR 17.73 lakh crore, or 47.21 per cent of project cost. The road ministry has the most projects, 974, followed by railways with 284. The report did not say how many projects ran over cost.Read more
29 Oct 2026
The Kerala government has approved the Kerala Civil Aviation Development Cooperative Society to launch flight services, Chief Minister Shri V D Satheesan announced on October 25, 2026. The proposed airline initiative will be led by C N Vijayakrishnan, chairman of MVR Cancer Centre. The project is being presented as India’s first airline venture from the cooperative sector, expanding the role of cooperative institutions into aviation. The announcement was made during the silver jubilee celebrations of the Calicut City Service Cooperative Society in Kozhikode. Further details about the airline’s operations and launch timeline have not been specified in the announcement.Read more